Site Work Update

Phase 1: (northeast corner near sales center)

  • Street light bulbs along Cavalier Drive will be changed to a "warmer" color in the next few weeks. 
  • Landscaping along Cavalier Drive will begin this spring in early April. 
  • The fountain has been contracted for and will be operational in the spring of 2017.
  • Vehicular gates will be installed after all the houses are framed. 
  • Pedestrian gates are on order and will be installed community-wide in April, there was a delay with the manufacturer. 
  • The central mailbox has been ordered and will be installed in April.
  • Paver walkways are being repaired along the lawn. 

Phase 2: (Gaslight District) 

  • Landscaping on the west side of the phase will begin in April.
  • Street signs and street lights have been ordered. 
  • Paver bricks will be installed on Harlow and Glenn Miller Streets plus the alleys between the Carriage Homes. We will start with the main entrance and alternate sides so that there will be only a single lane for access. This will be late March/April 2017, we will give the exact dates as soon as they are known. 
  • Verizon and Cox installations are ongoing. Cox is direct bury so alleyways will need to be clear for them to complete their work. 
  • South Wall next to Galilee will begin after brick is on southern Carriage Homes, hopefully by early April. 
  • Paver walkways are being repaired along the lawn. 

Phase 3: (west side of the hotel)

  • Permanent power is in place.
  • Verizon and Cox are installed. 
  • Paver bricks will be installed at Dorsey Lane and Calloway Street as well as Bungalow Court. Work will take two weeks. 
  • Fence and staining along Holly Road is complete. 
  • Landscaping outside the fence along Holly Road is fifty percent complete. Asphalt needs to be removed to complete the work. This will be done early April. 

Phase 4: (Lot 80, 81, 82)

  • Lots are ready for construction. 

Cavalier Drive: 

  • Road will be closed to through traffic until the Hotel opens. 
  • Traffic pattern on Cavalier Drive is changing-- a separate update will be sent as soon as the final decision is made regarding access and parking. 

 

.....................................................................................................................................................................................

Latest Site Work Pictures

 

  

 

 

............................................................................................................................................................................................................................

Cavalier Hotel

Find the latest updates on the hotel at www.cavalierhotel.com.

............................................................................................................................................................................................................................

Excellence in Development Design Award

The Cavalier on the Hill was given the Excellence in Development Design Award for the Best Master Planned Project by the Hampton Roads Association for Commercial Real Estate

............................................................................................................................................................................................................................

 

Cavalier Realty Associates
757-352-2764

REALTOR logo Equal Housing Opportunity

Website design: Web Development Technology Partners, inc.